Sign In | Join Free | My chinacsw.com |
|
Brand Name : cable power transfer vehicle
Model Number : cable power transfer vehicle
Certification : CE ISO SGS
Place of Origin : China(mainland)
MOQ : 1 set
Price : USD 3000~7600set
Supply Ability : 100 sets month
Delivery Time : 20 work days after received balance payment
Packaging Details : trap and wooden case
Product Name : cable power transfer vehicle
Application : Transfer Materials
Color : Customized
Capacity : 1-300ton
Running speed : 0-20m/min
after-sales Service Provided : Engineers available to service machinery
cable power transfer vehicle Wireless Control Electrical Transport Wagon in workshop
Model | BTL-2t | BTL-20t | BTL-50t | BTL-100t | BTL-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Heigth(H) | 450 | 550 | 650 | 850 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 | |
Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 0.8 | 2.5 | 5.5 | 11 | 15 | |
Running Distance(m) | 0-20 | |||||
Max Wheel Load(KN) | 14.4 | 77.7 | 174 | 343.8 | 265.2 | |
Reference Weight(t) | 2.3 | 5.5 | 7.6 | 13.9 | 26 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
Applications
We produce a wide range of AGV Motorized Transfer Wagon , railway guided transfer carts, factory transport equipment, battery powered trolleys, intelligent self-propelled trolleys, die carts, industrial flat trailers, tilters and lifting platforms that operate in many industrial fields: metallurgy, manufacture, oil and gas, die shops, shipyards, chemical plant, automotive, mining industry, aerospace, power generation, coal industry, paper mills, metalworking, warehouse and many other lines. We are sure to provide the product you want!
prodution process
CNC Cutting
The steel plate is transported from warehouse to CNC cutting workshop for cutting.
Preliminary Assembling
Workers put the cut steel plate together according to the design drawing.
Welding
Weld the steel plate with automatic welding machine after the preliminary assembling.
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress.
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main component of the primer is zinc rich epoxy antirust paint.
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish.
Debugging
Debugging the cart after painting the finish with electric control system, after the debugging, the cart will be tested without load and then with load.
After the inspection, the cart will be transported to storage area.
![]() |
Cable Power Transfer Vehicle Wireless Control Electrical Transport Wagon In Workshop Images |